LINE | Name | Country | City | Regional Rail | |||
Line 2 | IT | Turin | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2024 | 9.1 | 9.1 | 100% | 13 | Measured | ||
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1500.0 | EUR | 1.3 | 2020 | 1950.0 | 214.3 | Trade | |
REFERENCE | https://tunnelbuilder.com/News/ItalyPiedmont-A-InfraTo-the-design-of-Line-2-in-Turin.aspx | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |