LINE Name Country City Regional Rail
Millennium Line Phase 1 CA Vancouver No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1998 2002* 19.9 0.0 0% 13 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1200.0** CAD 0.81 2000 972.0 48.8 Plan
REFERENCE https://web.archive.org/web/20181110080355/https://www.translink.ca/-/media/Documents/about_translink/corporate_overview/corporate_reports/history/translink_history_nov_2008.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* A small section was delayed to 2006.
** PDF-p. 55 of reference.
Go to Vancouver city page.