| LINE | Name | Country | City | Regional Rail | |||
| Tseung Kwan O Extension | HK | Hong Kong | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 1999 | 2002 | 4.0 | 4.0 | 100% | 5 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 16000.0 | HKD | 0.19 | 2000 | 3017.6 | 754.4 | ||
| REFERENCE | |||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||