| LINE | Name | Country | City | Regional Rail | |||
| Line 2 | BG | Sofia | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2008 | 2012 | 17.0 | 15.3 | 90% | 11 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 952.0 | EUR | 3.32 | 2010 | 3,927.6 | 231.0 | Trade | |
| REFERENCE | https://www.railway-technology.com/uncategorised/newsbulgaria-opens-sofia-metro-line-2/ | ||||||
| NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Sofia city page. | |||||||