| LINE | Name | Country | City | Regional Rail | |||
| Vaughan | CA | Toronto | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source | 
| 2009 | 2017 | 8.6 | 8.6 | 100% | 6 | Media | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source | 
| 3,200.0 | CAD | 0.81 | 2013 | 3,015.0 | 350.6 | Media | |
| REFERENCE | https://www.thestar.com/news/gta/transportation/2017/12/15/trudeau-wynne-tory-on-hand-to-cut-ribbon-on-32-billion-subway-extension.html | ||||||
| NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP.  Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.  | 
||||||