| LINE | Name | Country | City | Regional Rail | |||
| Line 3 | MX | Guadalajara | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2014 | 2020 | 21.5 | 5.4 | 25% | 18 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 31500.0 | MXN | 0.11 | 2017 | 3339.0 | 155.3 | Media | |
| REFERENCE | https://www.eleconomista.com.mx/estados/Linea-3-arriba-78-de-su-costo-20200121-0023.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Guadalajara city page. | |||||||