| LINE | Name | Country | City | Regional Rail | |||
| Terrassa tunnel | ES | Barcelona | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2008 | 2015 | 4.5 | 4.5 | 100% | 3 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 401.0 | EUR | 1.3 | 2011 | 521.3 | 115.8 | Plan | |
| REFERENCE | https://govern.cat/govern/docs/2012/10/03/12/36/6b33e55c-7ef4-4200-8517-97c7501d026e.pdf | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||