| LINE | Name | Country | City | Regional Rail | |||
| Monorail extension | JP | Osaka | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2018 | 2029 | 8.9 | 0.0 | 0% | 4 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 105000.0 | JPY | 0.01 | 2019 | 1050.0 | 118.0 | Plan | |
| REFERENCE | http://www.mlit.go.jp/common/001272230.pdf | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Osaka city page. | |||||||