LINE Name Country City Regional Rail
Line 16 CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2021 49.8 49.8 100% 29 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
49500.0 CNY 0.27 2013 13509.8 271.3 Media
REFERENCE http://www.bjnews.com.cn/news/2016/11/25/424943.html; https://baijiahao.baidu.com/s?id=1633332748114018963&wfr=spider&for=pc
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Beijing city page.