| LINE | Name | Country | City | Regional Rail | |||
| B1 Phase 1 | CN | Tianjin | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2015 | 2020 | 31.4 | 28.3 | 90% | 22 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 26488.0 | CNY | 0.26 | 2015 | 6842.7 | 217.9 | Media | |
| REFERENCE | http://www.rail-transit.com/file/upload/201907/15/10573644162.pdf | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Tianjin city page. | |||||||