| LINE | Name | Country | City | Regional Rail | |||
| Line 8 Phase 2 | CN | Wuhan | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2018 | 2021 | 16.7 | 16.7 | 100% | 12 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 13772.0 | CNY | 0.26 | 2015 | 3557.7 | 213.0 | Plan | |
| REFERENCE | http://img.thupdi.com/news/2015/08/1440573393290975.pdf | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Wuhan city page. | |||||||