| LINE | Name | Country | City | Regional Rail | |||
| Line 2 Southern Extension | CN | Shenyang | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 14.3 | 8 | Plan | |||||
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 10170.0 | CNY | 0.24 | 2019 | 2422.6 | 169.4 | Media | |
| REFERENCE | http://www.shenyangbus.com/a/sydt/2018/1227/10268.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Shenyang city page. | |||||||