| LINE | Name | Country | City | Regional Rail | |||
| Line 4 Phase 1 | CN | Changsha | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2013 | 2017 | 33.5 | 24 | Plan | |||
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 21938.0 | CNY | 0.28 | 2012 | 6160.6 | 183.9 | Plan | |
| REFERENCE | https://www.ndrc.gov.cn/fzggw/jgsj/zcs/sjdt/201212/t20121224_1145294.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Changsha city page. | |||||||