| LINE | Name | Country | City | Regional Rail | |||
| Line 2 Phase 2 | CN | Kunming | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2017 | 2019 | 9.2 | 9.2 | 100% | 8 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 5326.0 | CNY | 0.27 | 2013 | 1453.6 | 158.0 | Plan | |
| REFERENCE | http://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=12400 | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||