| LINE | Name | Country | City | Regional Rail | |||
| Line 4 Phase 2 | CN | Shenzhen | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 15.94 | 5.09 | 31% | 10 | Plan | |||
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 5799.0 | CNY | Plan | |||||
| REFERENCE | http://fgw.sz.gov.cn/zwgk/qt/tzgg/201902/P020190226346098115982.pdf | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||