| LINE | Name | Country | City | Regional Rail | |||
| First stage | TR | Adana | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 1996 | 2010 | 13.9 | 3.5 | 25% | 13 | Wiki | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 534.0* | USD | 2.0 | 2006 | 1068.0 | 76.8 | Media | |
| REFERENCE | https://www.sabah.com.tr/gundem/2010/05/13/adana_metrosu_hizmete_giriyor | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * 340 in 1996-2002, 194 in 2008-10. |
||||||