LINE Name Country City Regional Rail
First stage TR Adana No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1996 2010 13.9 3.5 25% 13 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
534.0* USD 2.0 2006 1068.0 76.8 Media
REFERENCE https://www.sabah.com.tr/gundem/2010/05/13/adana_metrosu_hizmete_giriyor
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* 340 in 1996-2002, 194 in 2008-10.
Go to Adana city page.