LINE Name Country City Regional Rail
Phase 1 IN Ahmadabad No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2015 2023 40.0 6.4 16% 33 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
127000.0 INR 0.05 2019 5969.0 149.2 Media
REFERENCE https://indianexpress.com/article/cities/ahmedabad/ahmedabad-metro-phase-1-delay-makes-cost-jump-by-rs-2000-cr-6486037/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.