LINE | Name | Country | City | Regional Rail | |||
Line 11 West | CN | Beijing | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2019 | 2021 | 4.0 | 4.0 | 100% | 4 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
4890.0 | CNY | 0.24 | 2019 | 1164.8 | 291.2 | Media | |
REFERENCE | http://www.tzxm.gov.cn/flfg/law/201912/t20191220_12825.html | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||