LINE Name Country City Regional Rail
Line 6 Phase 1 and 2 CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2008 2014 42.85 42.85 100% 27 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
32250.0 CNY 0.32 2009 10234.8 238.9 Media
REFERENCE https://zh.wikisource.org/zh-hans/%E5%9B%BD%E5%AE%B6%E5%8F%91%E5%B1%95%E6%94%B9%E9%9D%A9%E5%A7%94%E5%85%B3%E4%BA%8E%E5%8C%97%E4%BA%AC%E5%B8%82%E5%9C%B0%E9%93%816%E5%8F%B7%E7%BA%BF%E5%B7%A5%E7%A8%8B%E5%8F%AF%E8%A1%8C%E6%80%A7%E7%A0%94%E7%A9%B6%E6%8A%A5%E5%91%8A%E7%9A%84%E6%89%B9%E5%A4%8D
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Beijing city page.