LINE | Name | Country | City | Regional Rail | |||
Line 7 Phase 2 (Eastern Extension) | CN | Beijing | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2016 | 2020 | 17.2 | 15.0 | 87% | 9 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
15330.0 | CNY | 0.25 | 2016 | 3843.1 | 223.4 | Media | |
REFERENCE | https://zh.wikisource.org/zh-hans/%E5%8C%97%E4%BA%AC%E5%B8%82%E5%9F%8E%E5%B8%82%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A%E7%AC%AC%E4%BA%8C%E6%9C%9F%E5%BB%BA%E8%AE%BE%E8%A7%84%E5%88%92%EF%BC%882015%EF%BD%9E2021%E5%B9%B4%EF%BC%89 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Beijing city page. |