LINE Name Country City Regional Rail
Line 8 Phase 3 North CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2021 3.6 3.6 100% 3 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
CNY 0.24 2019 0.0 Media
REFERENCE https://www.bjsubway.com/news/ghjs/2013-12-30/1316.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.