LINE Name Country City Regional Rail
Line 8 Phase 3 South CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2014 2018 13.0 13.0 100% 11 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
CNY 0.27 2014 0.0 0.0 Media
REFERENCE https://www.bjsubway.com/news/ghjs/2013-12-30/1316.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.