LINE Name Country City Regional Rail
Metro Line 2 RS Belgrade No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2021 2026 20.0 20.0 100% 21 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2200.0 EUR 3.05 2023 6710.0 335.5 Trade
REFERENCE https://www.railwaypro.com/wp/alstom-involved-in-the-belgrade-metro-project/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.