LINE | Name | Country | City | Regional Rail | |||
Line 3 | ES | Bilbao | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2007 | 2016 | 5.9 | 5.6 | 95% | 7 | Measured | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
279.0 | EUR | 1.3 | 2011 | 362.7 | 61.5 | Media | |
REFERENCE | https://www.eitb.eus/es/noticias/economia/detalle/4706859/inauguracion-linea-3-metro-bilbao-operada-euskotren-8-abril/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Bilbao city page. |