LINE | Name | Country | City | Regional Rail | |||
Bursaray | TR | Bursa | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
1997 | 2014 | 39.0 | 6.25 | 16% | 38 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
425.0 | EUR | 2.1 | 2006 | 892.5 | 22.9 | Media | |
REFERENCE | https://rayhaber.com/2011/04/en-hesapli-bursaray-ihalesi-kestel-etabinin-kilometre-maliyeti-universite-etabinin-ucte-biri/, https://rayhaberpozitif.wordpress.com/tag/hasim-iscan-caddesi/, https://www.haberler.com/bursaray-kestel-hattinin-temeli-atildi-insaat-1-5-2901776-haberi/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Bursa city page. |