LINE Name Country City Regional Rail
Line 6 EG Cairo No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 21.0 13.7 65% 24 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
4000.0 USD 3.1 2017 12400.0 590.5 Media
REFERENCE https://tunnelbuilder.com/News/New-metro-line-6-in-Cairo-deal-signed-.aspx
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Cairo city page.