LINE | Name | Country | City | Regional Rail | |||
Line 5 South Extension | CN | Changsha | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2018 | 2022 | 8.43 | 8.43 | 100% | 7 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
6727.0 | CNY | 0.24 | 2017 | 1607.8 | 190.7 | Plan | |
REFERENCE | https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201703/W020190905497919692262.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||