LINE Name Country City Regional Rail
Red Line TH Chiang Mai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2022 2027 15.8 7.2 46% 12 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
27000.0 THB 0.08 2024 2187 138.4 Media
REFERENCE https://www.nationthailand.com/business/30382028