LINE Name Country City Regional Rail
Red Line TH Chiang Mai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2022 2027 15.8 7.2 46% 12 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
27000.0 THB 0.08 2024 2187.0 138.4 Media
REFERENCE https://www.nationthailand.com/business/30382028
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Chiang Mai city page.