LINE Name Country City Regional Rail
City Circle Line DK Copenhagen No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2019 15.5 15.5 100% 17 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
25300.0 DKK 0.14 2014 3491.4 225.3 Media
REFERENCE https://www.thelocal.dk/20190930/in-pictures-copenhagens-new-city-ring-metro-line
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Copenhagen city page.