LINE Name Country City Regional Rail
Phase 4 second half IN Delhi No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2025 42.3 14.7 35% 43* Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
215363.5** INR 0.05 2022 10122.1 239.3 Media
REFERENCE https://economictimes.indiatimes.com/news/politics-and-nation/operational-loss-in-delhi-metro-phase-iv-project-to-be-borne-by-delhi-govt-sc/articleshow/71008680.cms
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Source has much higher total length than others: https://themetrorailguy.com/delhi-metro-phase-4-information-map/
** Obtained by subtraction from the first half (“priority corridors”).