LINE | Name | Country | City | Regional Rail | |||
Line 6 | BD | Dhaka | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2015 | 2021 | 20.0* | 0.0 | 0% | 16 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
220000.0 | BDT | 0.03 | 2018 | 7040.0 | 352.0 | Media | |
REFERENCE | https://www.railwaygazette.com/projects-and-planning/tracklaying-starts-on-dhaka-metro/55647.article | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Linked source says 19.9, these say 20.1: https://www.dhakatribune.com/bangladesh/2020/06/02/over-70-of-metro-rail-phase-1-complete http://103.48.18.161/admin/docs/news/rthd_13.pdf |
||||||