LINE Name Country City Regional Rail
Line 3 feeder CN Dongguan No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2024 2028 1.8 1.8 100% 1 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1297.0 CNY 0.24 2019 309.0 171.6 Plan
REFERENCE https://baijiahao.baidu.com/s?id=1638089292564878111&wfr=spider&for=pc
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Dongguan city page.