LINE Name Country City Regional Rail
Wehrhahn Line DE Dusseldorf No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2007 2016 3.4 3.4 100% 6 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
929.0 EUR 1.3 2012 1207.7 355.2 Media
REFERENCE https://www.wz.de/nrw/duesseldorf/wehrhahn-linie-wird-noch-viel-teurer_aid-25646289
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Dusseldorf city page.