LINE Name Country City Regional Rail
U-Bahn Europaviertel DE Frankfurt No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2025 2.7 1.4* 52% 4 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
373.5 EUR 1.3 2022 485.6 179.8 Media
REFERENCE https://www.fnp.de/frankfurt/frankfurt-u-bahn-u5-verlaengerung-spaeter-teurer-wegen-eva-zr-13449222.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Source says 850 m but excludes a shorter tunnel under a park, and the exact portals are easily visible on Google Earth.