| LINE | Name | Country | City | Regional Rail | |||
| U-Bahn Europaviertel | DE | Frankfurt | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2019 | 2025 | 2.7 | 1.4* | 52% | 4 | Measured | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 373.5 | EUR | 1.3 | 2022 | 485.6 | 179.8 | Media | |
| REFERENCE | https://www.fnp.de/frankfurt/frankfurt-u-bahn-u5-verlaengerung-spaeter-teurer-wegen-eva-zr-13449222.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Source says 850 m but excludes a shorter tunnel under a park, and the exact portals are easily visible on Google Earth. |
||||||
| Go to Frankfurt city page. | |||||||