| LINE | Name | Country | City | Regional Rail | |||
| Line 4 Phase 1 | CN | Fuzhou | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2017 | 2021 | 24.2 | 24.2 | 100% | 21 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 18436.0 | CNY | 0.26 | 2015 | 4762.6 | 196.8 | Plan | |
| REFERENCE | https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201601/t20160112_1145713.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||