LINE Name Country City Regional Rail
Line 4 Phase 1 CN Fuzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2021 24.2 24.2 100% 21 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
18436.0 CNY 0.26 2015 4762.6 196.8 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201601/t20160112_1145713.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.