LINE Name Country City Regional Rail
CEVA CH Geneva Yes
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2019 8.8 8.4 96% 4 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1567.0 CHF 0.68 2016 1065.6 121.1 Plan
REFERENCE https://www.ceva.ch/2017/05/11/financement-et-organisation/?b=https://www.ceva.ch/category/projet
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Geneva city page.