LINE Name Country City Regional Rail
Principe – De Ferrari IT Genova No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1998 2006 2.5 2.5 100% 4 wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
212.0 EUR 1.3 2002 275.6 110.2 plan
REFERENCE http://www.rivistacorteconti.it/export/sites/rivistaweb/RepositoryPdf/2017/fascicolo_16_2017/30_CDC_gestione_4.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Genova city page.