LINE | Name | Country | City | Regional Rail | |||
Line 1 Phase 1 | CN | Guiyang | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2013 | 2017 | 34.3 | 29.0 | 84% | 25 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
19370.0 | CNY | 0.3 | 2010 | 5818.6 | 169.6 | Media | |
REFERENCE | https://zh.wikipedia.org/wiki/%E8%B4%B5%E9%98%B3%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A1%E5%8F%B7%E7%BA%BF | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Guiyang city page. |