LINE Name Country City Regional Rail
Phase 2 IN Gurgaon No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2017 6.3* 0.0 0% 5 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
24230.0 INR 0.05 2015 1260.0 200.0 Media
REFERENCE http://www.ptinews.com/news/8562521_Second-phase-of-Gurgaon-s-Rapid-Metro-launched.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Source says 6.6 km but also says the the phase 1 length is 5.1 km and not 5.5.