LINE | Name | Country | City | Regional Rail | |||
Line 1 Phase 1 | CN | Hangzhou | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2007 | 2012 | 48.0 | 31 | Plan | |||
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
22076.0 | CNY | 0.33 | 2007 | 7335.9 | 152.8 | Plan | |
REFERENCE | https://tieba.baidu.com/p/4042648134?red_tag=1976143705; https://www.sohu.com/a/277774667_180330; http://zzhz.zjol.com.cn/05zzhz/system/2007/01/10/008096707.shtml | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||