LINE Name Country City Regional Rail
Line 2 Eastern Extension CN Hefei No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
not started 14.5 14.5 100% 11 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
10107.0 CNY 0.24 2020 2407.5 166.0 Plan
REFERENCE http://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=16921
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Hefei city page.