LINE Name Country City Regional Rail
Line 2 Eastern Extension CN Hefei No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
not started 14.5 14.5 100% 11 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
10107.0 CNY 0.24 2020 2407.5 166.0 Plan
REFERENCE http://zfxxgk.ndrc.gov.cn/web/iteminfo.jsp?id=16921
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.