LINE Name Country City Regional Rail
Line 2 first phase VN Ho Chi Minh City No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2026 11.3 9.3 82% 11 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
48000000.0 VND 0.0 2023 6048.0 535.2 Media
REFERENCE https://e.vnexpress.net/news/news/saigon-metro-lines-cost-escalation-cleared-construction-not-to-stop-4002027.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Ho Chi Minh City city page.