LINE Name Country City Regional Rail
Sha Tin-Central Link HK Hong Kong Yes
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2012 2022 17.0 15.0 88% 9 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
87300.0 HKD 0.17 2017 14526.7 854.5 Trade
REFERENCE https://www.railwaygazette.com/infrastructure/shatin-central-project-faces-23-cost-increase/45602.article
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.