LINE Name Country City Regional Rail
Tseung Kwan O Extension HK Hong Kong No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1999 2002 4.0 4.0 100% 5 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
16000.0 HKD 0.19 2000 3017.6 754.4
REFERENCE
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Hong Kong city page.