LINE Name Country City Regional Rail
M11 Phase 1 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2021 37.5 37.5 100% 9 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1130.0 USD 3.1 2019 3503 93.4 Media
REFERENCE https://www.insaatderyasi.com/gayrettepe-3-havalimani-metro-ihalesine-1-milyar-euro-1718h.htm
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.