LINE Name Country City Regional Rail
M1A-M1B (LR) TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1987 2014 26.6 9.7 36% 23 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
882.0 USD 2.2 2000 1940.4 72.9 Plan
REFERENCE
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.