LINE Name Country City Regional Rail
M3 Phase 1 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2006 2013 16.1 15.9 100% 11 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1344.0 USD 1.6 2010 2150.4 133.6 Media
REFERENCE https://www.sabah.com.tr/Gundem/2013/06/14/istanbula-yeni-metro
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.