LINE Name Country City Regional Rail
M3 Phase 3 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2022 6.2 6.2 100% 4 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
205.9 USD 3.7 2020 761.8 122.9 Plan
REFERENCE https://rayhaber.com/2017/03/basaksehir-kayasehir-metrosu-insaati-ihale-sonucu/,
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.